We started installing the new metal yardage tee markers this week. The new markers are simple and maintenance free. We prefabricated a concrete base which will help stabilize the markers and prevent any accidental trips into someones bag or front yard. All the markers should be installed by the end of next week. We are also in the process of installing new road crossing signs. This was done at the request of the HOA.
Allister MacKenzie
“A golf course should be made interesting and a good test of golf by the tilt of the greens and the character of the undulations.”
Friday, March 20, 2015
Tuesday, March 17, 2015
Well Update
The well project has been slow going the past two weeks. After changing the drill rig from a traditional drill to an air hammer, Maggiora Brothers were able to break through the granite and drill several hundred additional feet. After breaking through the granite the well drillers decided to not case the well below the granite, thinking the material below the granite would be hard. The material below the granite turned out to be very soft and the well collapsed. The drill bit and several cones broke off and are stuck in the bottom of the well. The well drillers tried to retrieve their equipment for over a week, with no success, as the well continued to collapse every time they went down. Over the past several days they were able to case the rest of the well and are now attempting to retrieve the cones and drill bit.
We are currently at 800' and the well is producing 20-40 gal/minute. This is far from the 200 gal/minute we are hoping for. The data shows the majority of water to be at the 1200'-1300' depth. We want to reiterate this is a test drill and there is the possibility we will not find any water. As frustrating as this is it's completely out of our control. Maggiora Brothers wants to complete this well as soon as possible so they can move on to their next job. We will send out an update as soon as we find out any additional information. Thank you for your patience and understanding.
We are currently at 800' and the well is producing 20-40 gal/minute. This is far from the 200 gal/minute we are hoping for. The data shows the majority of water to be at the 1200'-1300' depth. We want to reiterate this is a test drill and there is the possibility we will not find any water. As frustrating as this is it's completely out of our control. Maggiora Brothers wants to complete this well as soon as possible so they can move on to their next job. We will send out an update as soon as we find out any additional information. Thank you for your patience and understanding.