• It will take approximately 20 weeks to complete the tank construction (2-1-17 projected completion)
  • All of the dirt that is being stored by the 2nd tee will be used as backfill against the tank. 
  • All of the dirt that is being stored at the project location will be top soil for finish grade.
  • We applied hydromulch to all three piles to ensure they stay in place during the winter months. 
  • We should complete the installation of the overflow pipeline right of the 14th hole and behind the green. The piles of sand behind the 14th green/15th tee will be used for backfill against the pipeline.
  • The overflow pipeline is mandated in our construction permit in case of emergency
  • It appears we will be tying into the new sewer system that recently got extended from Graham Hill road to Orchard drive on Sims road. We need to dispose of waste from our restroom but also backwash from our filtration station.The backwash was causing an issue that disposing of it into the sewer will resolve.
  • We have had our preliminary meetings with Scotts Valley and their engineers to come up with the best solution to divert the recycled water at Sims and Graham Hill to our plant. Scotts Valley will present to Pasatiempo 3 options for diversion and delivery by November 1st.
  • The projected completion date for the project is July 1, 2017